Skip to main content
Loading…
This section is included in your selections.

The connection fee for all properties connecting to a community interim sewerage facility shall be equal to the reserve capacity charge set forth in Section 13.16.025 and sewerage general facilities charge levied pursuant to Section 13.16.027, together with the estimated costs of running a public collection system past the development if the construction will be necessary and the estimated cost of connecting the interim system to the public system. The city may also require the filing of a waiver of protest of a future ULID for sewerage services.

The required connection fees must be paid in full before construction on the interim sewerage facilities is commenced. The city may, in an appropriate case, waive the advance payment of a portion of the required fees on the basis that such fees will be included in a ULID assessment. (Ord. 877 §3 (part), 1990; Ord. 599 §5, 1981; Ord. 281 (part), 1973).