Acceptance by the city for maintenance and operation of main lines and service lines up to any meter installation shall be made prior to use of the lines for any purpose except for testing, disinfection and flushing. Acceptance shall be made only after:

A. Satisfactory pressure tests to one hundred fifty percent of working pressure but in no case less than one hundred fifty p.s.i., such tests to be conducted and documented by the contractor and witnessed by an inspector for the licensed engineer under whose direction the work is performed or by employees of the Lacey Water Department; and

B. Satisfactory bacteriological tests; and

C. Certificates of inspection by a registered, professional engineer per WAC 248-54-340; and

D. Completed, “as built” drawing on reproducible mylar showing the facilities as constructed including depth of lines and reference ties to all underground valves and fittings;

E. Compliance with all provisions of this chapter. (Ord. 1097 §9, 1999; Ord. 494 §18, 1978).