Skip to main content
Loading…
This section is included in your selections.

For purposes of this chapter, the following terms shall have the meanings set forth:

A. Facilities” may include any or all of the following:

Water: Public water facilities constructed within the city or connected to the city water system(s).

Sewer: Public sewage facilities constructed within the city or connected to the city sewerage system and/or discharging into or through the city’s sewage system(s).

Drainage: Public drainage facilities constructed within the city or connected to the city drainage system and/or discharging into or through the city’s drainage system(s).

Streets: Public streets constructed within public right-of-way or public easements within the city.

Curb, gutter and sidewalk: Public curb, gutter and sidewalk constructed within public right-of-way within the city.

Lighting: Street lighting facilities constructed within public right-of-way within the city.

Signals: Public traffic signals constructed within public right-of-way within the city and other traffic signals for which the city shall assume maintenance responsibility.

Other: Any other public facilities within the city or facilities connected to a city system.

B. Plan checking”: The process performed by the city to check the completeness and accuracy of any drawings, calculations and other information submitted for public works approval and to review and confirm the facility satisfies and meets the intent of all city and other requirements.

C. Inspection” means the field verification and documentation by the city of the construction of any facility.

D. Third submittal” shall mean the third and any subsequent submittal of construction drawings, specifications, drainage calculations, and/or other information that requires additional plan checking pertaining to the construction of city facilities. (Ord. 875 §16 (part), 1990).