Skip to main content
Loading…
This section is included in your selections.

A. Construction and Installation. The construction and installation of antenna support structures, antennas, attachment support structures and equipment enclosures shall be subject to the requirements of the city’s Development Guidelines and Public Works Standards (with structural calculations provided by the applicant’s Washington-licensed engineer), including the city’s electrical code, and all applicable and most current standards published by the Electronics Industries Association/Telecommunications Industries Association (EIA/TIA). For structural components in particular, analysis per the most current TIA-222 is required.

B. WCF Equipment Enclosures. WCF enclosures shall be kept locked at all times and shall be clearly labeled as to the owner, operator, or a person to be contacted in the event of an emergency.

C. Sidewalks. WCFs shall not obstruct an existing public sidewalk or trail or area of public right of way or easement reserved for a future public sidewalk or trail.

D. Street Lanes. WCFs shall not obstruct a traffic lane, parking lane or bicycle lane and shall not create a traffic or sight distance impairment. (Ord. 1546 §16, 2019).