Skip to main content
Loading…
This section is included in your selections.

A. All projects shall comply with the Stormwater Design Manual. See Chapter 2 of the Stormwater Design Manual for details and applicability of the nine core requirements:

Core Requirement No. 1: Preparation of stormwater site plans.

Core Requirement No. 2: Construction stormwater pollution prevention plan (SWPPP).

Core Requirement No. 3: Source control of pollution.

Core Requirement No. 4: Preservation of natural drainage systems and outfalls.

Core Requirement No. 5: On-site stormwater management.

Core Requirement No. 6: Runoff treatment.

Core Requirement No. 7: Flow control.

Core Requirement No. 8: Wetlands protection.

Core Requirement No. 9: Operation and maintenance. (Ord. 1525 §1 (part), 2017).